Blog · Web development
Data governance and quality: the method, not the binder

On this page
Business rules written with the business, six quality dimensions, parity controls in migration, role-based permissions, GDPR records and handover.
Data governance is not a document, it is a set of controls that run. On an application project it takes the form of four deliverables: business rules written with the business, automated controls that check those rules continuously, a reference-data registry naming the source of truth for each entity, and a role-based permissions matrix. The rest is documentation and handover.
Put differently: if your governance lives in a binder nobody opens, it does not exist. Here is how we organise it concretely, and where the legal obligations sit that are not up for negotiation.
Business rules are written with the business, not for it
This is the starting point, and the one most often skipped. A business rule is not a technical constraint, it is a business decision: a customer number cannot change, a case cannot move to invoicing without a signed quote, a negative amount is forbidden except for credit notes. Nobody on a technical team can invent those rules, and nobody on a business team states them spontaneously because they are obvious to them.
Our method has three steps. Start from real cases, not from the database schema: ask to see ten records, three of which caused problems. Then formalise each rule in a verifiable form, with an example that passes and one that fails, because a rule without a counter-example is an intention. And name an owner on the business side for each one, the person who will decide when an edge case reaches production.
That last point matters most. A rule without an owner ends up decided by a developer at nine in the evening, which is the surest way to introduce an unintended business decision into the system.
Quality controls: six dimensions, and somewhere to run them
Data quality is measured on six dimensions, and naming them avoids vague discussions about “dirty” data.
- Completeness. Are mandatory fields filled in, and across what share of records?
- Validity. Do values respect their format and domain: a postcode, a company number, a value from a closed list.
- Uniqueness. How many duplicates, under which matching key?
- Consistency. Do linked values contradict each other, for instance an end date before a start date, or a total that does not match the sum of its lines.
- Accuracy. Does the data match reality? It is the only dimension you cannot check without the business or an external source.
- Freshness. How long since the data was updated, and is that acceptable for the use being made of it?
These controls must run in three places, not one. At entry, to stop the error getting in. Continuously in the system, because data that was valid at creation becomes wrong over time. And in a dashboard the business can read, with an alert threshold and a named recipient. A control whose results reach nobody is not a control, it is a log.
For reporting, a query tool open to business users changes the mood of a project: discrepancies become visible, get discussed and get fixed, instead of travelling by rumour. We set out that logic in our article on Metabase.
And this is not merely a comfort. Article 5 of the GDPR, whose text the French regulator publishes, requires in paragraph 1(d) that data be accurate and, where necessary, kept up to date, with inaccurate data erased or rectified without delay. The quality of personal data is an obligation, not a good practice.
Parity controls: proving a migration is faithful
This is the subject almost nobody writes about, and the one that sinks data migrations. Parity means demonstrating that the target system says the same thing as the source, before unplugging the old one.
Concretely, we produce four families of controls. Record counts by entity and by period, because a volume gap jumps out. Checksums on the quantities that matter, typically amounts, volumes and balances, aggregated by month and by business axis. Replays of a sample of records, chosen with the business and deliberately including the awkward cases. And an exhaustive list of discrepancies, each explained and classified as an acceptable gap or an anomaly to fix.
The rule we apply without exception: no cutover without a parity report approved by the business. Not to cover ourselves, but because it is the only moment when comparison is still possible. Three months after the source is switched off, nobody can say whether a gap came from the migration or from the normal life of the system.
A useful corollary: keep the source read-only for a defined period, a few weeks to a few months depending on the domain, and decide its shutdown date in writing from the start. Otherwise it survives for years, and you have two versions of the truth.
Reference data: one source of truth per entity
Reference data covers the objects shared by several processes: customers, suppliers, products, sites, employees, classifications. They raise three simple questions that are rarely settled.
Which system is the source of truth for this entity? One answer per entity, not two. Who may create, modify and deactivate a record? That is a permissions question as much as an organisational one. And what happens to a code that is no longer used? You deactivate it, you do not delete it, because it is still referenced in history.
Two pieces of field advice. First, resist the urge to build a central registry before you need one. A registry is justified when at least two systems consume the same data and already diverge. Before that, it is an expensive project nobody feeds. Second, handle duplicates with a written, versioned matching rule rather than a one-off manual clean-up, otherwise they come back.
Role-based permissions, and the review nobody does
The principle is least privilege: every user reaches only the data they need. In practice that means roles, not rights granted person by person, otherwise the system becomes unreadable within six months.
The French regulator’s guidance on managing permissions, updated on 13 March 2024, lists basic precautions worth copying straight into a requirements document. Define permission profiles that separate tasks and responsibilities. Have every access request approved by a manager. Remove permissions as soon as someone changes role or position, and at the end of a contract. And review permissions at least once a year, involving the business.
That annual review is the simplest measure and the least applied. It consists of printing the access list by role and having managers read it, since they are the only ones who know that someone moved department in March. It takes half a day and it always turns up access that should no longer exist.
On shared accounts the regulator is clear: they are among the things not to do, barring a traced exception, approved by a manager and reviewed regularly. In a business application, a generic account used by three people removes all traceability, and with it any ability to investigate after an incident. We drew the same conclusions from a public data breach.
GDPR: the three obligations that shape the project
Three articles of the regulation bear directly on design, and it is better to know them before drawing the data model.
Article 5 sets the principles, including minimisation: data must be adequate, relevant and limited to what is necessary in relation to the purposes. That is a design argument, not a slogan: every field collected without a clear purpose is both a legal and a technical debt. Paragraph 2 adds that the controller must be able to demonstrate compliance with those principles, which implies keeping evidence.
Article 25 requires data protection by design and by default. By default, only the data necessary for each purpose is processed, and that covers the amount collected, the extent of processing, the storage period and accessibility. In practice: retention periods and access rights are system parameters from the first version, not options.
Article 30 requires a record of processing activities. The regulator’s page details its contents: purposes, categories of individuals and data, categories of recipients, transfers outside the European Union and the safeguards applied, erasure deadlines, and a general description of security measures. The format is free, the requirement is not, and the derogation for organisations under 250 employees is in practice very limited.
Working with the DPO, without handing them the project
The data protection officer is an ally, provided you know what to expect from them. Chapter IV of the GDPR, reproduced by the regulator, sets out their tasks in article 39: informing and advising, monitoring compliance with the regulation and internal rules, advising on impact assessments and verifying their performance, cooperating with the supervisory authority and acting as its contact point.
Article 38 sets their position, and that is what changes how you work with them. They must be involved in a timely manner in all data protection matters, which means at scoping rather than at acceptance testing. They receive no instructions on how to carry out their tasks, cannot be dismissed or penalised for doing so, and report to the highest management level.
As for designation, it is mandatory for public authorities and bodies, for organisations whose core activities require regular and systematic monitoring on a large scale, and for those processing special categories of data or criminal offence data on a large scale.
One point of method that avoids much confusion: the DPO advises and monitors, they do not decide in place of the controller, on whom the regulation places responsibility for compliance and the burden of demonstrating it. Asking them to sign off a data model on your behalf both pushes them out of their role and deprives you of their critical eye.
In practice we involve them at three moments: at scoping, to settle purposes and retention periods; at data model design, for minimisation and access; and before go-live, for the record of processing and, where applicable, the impact assessment.
Handover to business owners: have them do it, do not show them
Useful documentation comes down to four pieces, and it must live in the tool rather than in a shared folder. A data dictionary giving each field its business definition, format, mandatory status and source. The catalogue of business rules with their owners. The routine operating procedures, notably creating a user and correcting a wrong value. And the role-based permissions matrix.
The handover itself is not a presentation of those documents. It consists of having the business owner perform, in front of you, the actions they will have to do alone: create a user, remove an access, correct a record, read the quality dashboard and know what to do with an alert. Until they have done it themselves, they cannot do it.
Name one owner per data domain, not a single owner overall. Whoever owns the customer registry is not whoever owns the product registry, and loading everything onto one person guarantees that everything stops when they leave.
And when AI enters the picture
A detail that is not one: connecting an assistant to your data makes quality visible overnight. A human reading an inconsistent customer record corrects it mentally, whereas a model answers confidently from the wrong value. In our experience, internal assistant projects have become the best revealer of the true state of a data estate.
The tactical consequence: if you plan an assistant querying your documents or your database, deal with quality controls and permissions first, not afterwards. Access rights must also propagate all the way into retrieval, otherwise the assistant becomes an elegant way to read what you are not allowed to see. We detail that architecture in our article on RAG over internal documents.
What we take away from it
Data governance comes down to four living artefacts: rules written with the business and given an owner, controls running across six dimensions and alerting a named person, a registry naming one source of truth per entity, and role-based permissions reviewed at least yearly with the business.
Three legal requirements frame all of it: accuracy and minimisation under article 5, protection by design under article 25, and the record of processing under article 30. The DPO advises and monitors, they do not carry compliance on your behalf.
And the final step is not go-live, it is handover: one owner per domain, who has performed the actions themselves before you leave. We build business applications to that standard, and we connect AI assistants to governed data. If you have a data estate you have doubts about, let’s talk.
FAQ
Frequently asked questions
What is data governance in an application project?
It is the set of rules, controls, and responsibilities that ensure data is accurate, up to date, and accessible to the right people. It takes shape through four deliverables: business rules written with the business teams and each with an owner, automated quality controls, a reference framework designating a single source of truth per entity, and a role-based permissions matrix. If it lives in a document no one opens, it does not exist.
How do you measure data quality?
Across six dimensions: completeness of required fields, validity of formats and value domains, uniqueness according to a matching key, consistency between related data, accuracy against reality, and freshness. These controls must run at data entry, continuously in the system, and in a dashboard the business team can read, with an alert threshold and a named recipient.
What is a parity check during a data migration?
It is the demonstration that the target system says the same thing as the source before disconnecting the old one. It combines counts by entity and by period, checksums on amounts and quantities, replaying a sample of records chosen with the business team, and the exhaustive list of discrepancies qualified as acceptable or as anomalies. The rule is not to switch over without a parity report approved by the business team.
What does the GDPR say about data quality and minimization?
Article 5 requires that data be adequate, relevant, and limited to what is necessary for the purposes, and that it be accurate and, where necessary, kept up to date, with inaccurate data erased or rectified without delay. The controller must be able to demonstrate compliance with these principles. Article 25 requires protection by design and by default, and Article 30 requires the record of processing activities.
What is the role of the DPO in a data project?
Under Article 39 of the GDPR, the DPO informs and advises, monitors compliance with the regulation and internal rules, advises on impact assessments and verifies their execution, cooperates with the supervisory authority, and serves as a point of contact. Article 38 specifies that the DPO must be involved, in a timely manner, in all data protection matters, receives no instructions on the exercise of these duties, and reports to the highest level. The DPO advises and monitors, but responsibility for compliance remains with the controller.
Read next
Guides on the same topic
Explore the topic further with a selection of complementary resources.
Nov 16, 2026
Stripe, Mangopay or Lemonway: which payments for a marketplace
Pricing read on 16 November 2026, the three regulatory statuses, the hidden cost of seller KYC, and the five questions that actually decide.
Aug 26, 2026
Electronic invoicing: turning compliance into accounting automation
Electronic invoicing is reshaping workflows, tools, and data, paving the way for SME accounting automation.